1 / 5Click to expandPrice from
$502K2BR apartments and 4BR / 6BR villas in Pererenan, Bali — a 15-unit mixed development in central Pererenan with either freehold or leasehold to 2052 (26 years). From $502,000; handover targets June 2026.
Lease and ownership terms:
• Freehold path or 26-year leasehold to 2052 — dual-tenure optionality is rare in new Canggu product and materially changes exit options;
• 40% down on signing;
• Orange-zoned land — non-standard zoning, verify with the developer.
Location, district and beach access:
• 2.1 km to the coast (Warung Pantai and Finns Beach Club inside the catchment); 3 km south to central Canggu;
• K&A Grill (130 m), Pump Kitchen (160 m) and Chillilime (180 m) — restaurants on the lane;
• The Montessori School (immediate catchment), La Brisa, Seseh Pizza, Jungle Padel, Cloud Spa and Pepito all inside short scooter radius.
Amenities and on-site facilities:
• Gym, sauna, swimming pool, lounge, co-working space, outdoor terrace, kids club, concierge and 24/7 security — resort-calibre programme;
• Amenity depth matters most for the larger villa tickets — a $2M buyer expects programmatic amenity, not just a private pool.
Floor plans, sizes and pricing:
• 229 m² 2-bedroom apartment with private pool — $502,000;
• 334 m² 4-bedroom, 4-bathroom villa with private pool — $818,000;
• 625 m² 6-bedroom, 6-bathroom estate villa with private pool — $2,223,000;
• $1.7M spread between entry and flagship at a single compound is genuinely rare in this sub-market.
Who this fits:
• Buyers wanting configuration range from compact apartment to large-format villa inside one address;
• Long-horizon owners using the freehold path for generational planning in Canggu's lifestyle-dense pockets;
2-6BR Apartments and Villas in Pererenan
Interested? Get in touch
Price from
$502K• Operators short-letting to the Pererenan design-literate guest profile, with the kids club and Montessori catchment lifting family-mode booking.
Buyers wanting a delivered operational asset today should look at completed Pererenan inventory — this is off-plan with 18 months of construction risk priced in.